Strip-out and make-safe
Full removal of tiles, wall sheeting, vanity, bath, screen and fixtures, with services isolated by licensed trades. All waste removed from site and disposed of responsibly — no skip left on your Brisbane kerb for a fortnight.
Restart Property Group renovates bathrooms across Brisbane for homeowners, landlords, property managers and body corporates. One contract covers demolition, waterproofing, plumbing, electrical, tiling, fit-off and the final clean, with a fixed written price before work begins.
A bathroom renovation in Brisbane typically takes three to four weeks on site and costs between $18,000 and $30,000 for a standard main bathroom, or $30,000 to $55,000 for a large or structurally altered bathroom. Restart Property Group manages the full job — strip-out, waterproofing to AS 3740, plumbing, electrical, tiling, cabinetry, fit-off and the final clean — under one fixed written quote, with licensed Queensland trades and a QBCC-compliant scope.
Brisbane bathrooms age faster than most. Humidity, Queenslander subfloors, older copper pipework and decades-old waterproofing membranes mean a bathroom that looks merely tired is often leaking quietly into the wall frame. We open up, assess and price honestly, so you know what you are buying before a single tile comes off.
We inspect within three days anywhere in Brisbane and send a fixed written price within 48 hours. No deposit, no pressure, no sales visit that runs for three hours.
Send us the suburb, the size of the bathroom and what you would like changed. A Brisbane coordinator will arrange your on-site measure and send a written fixed price within 48 hours.
Every scope is written for the property in front of us. These are the elements included in a typical Brisbane job.
Full removal of tiles, wall sheeting, vanity, bath, screen and fixtures, with services isolated by licensed trades. All waste removed from site and disposed of responsibly — no skip left on your Brisbane kerb for a fortnight.
Rotten studs, soft subfloor, termite damage and failed sheeting repaired before anything is covered up. Common in pre-1980 Brisbane homes and Queenslanders, and the single biggest cause of a renovation going over budget when it is not checked first.
Relocation of waste and water points, new mixers, shower rails, bath spouts, heated towel rails, exhaust fans, downlights, three-in-one units and GPOs — all installed and certified by licensed Queensland tradespeople.
Membrane applied to the shower, floor and wet wall junctions by a licensed waterproofer, with the required curing time respected and a certificate issued. This is the step cheap quotes shortcut, and the one that causes leaks three years later.
Floor screeded to correct falls so water goes to the waste and not your hallway. Wall and floor tiling including large format, subway, fishscale and feature niches, with silicone and grout finished neatly.
Wall-hung or floor-standing vanities, stone or laminate tops, shaving cabinets, frameless or semi-frameless screens, toilet suites, tapware, accessories and the final paint, then a full detail clean before handover.
Prices below are realistic 2025 Brisbane ranges for a full renovation including labour, materials, waterproofing and certification. Your written quote is fixed to the scope agreed after the on-site measure.
| Scope | Typical Brisbane cost | Timeframe |
|---|---|---|
| Budget refresh (same layout, standard fittings) | $12,000 – $18,000 | 2 – 3 weeks |
| Standard main bathroom (full strip-out, same layout) | $18,000 – $30,000 | 3 – 4 weeks |
| Layout change (moving waste, bath to walk-in shower) | $28,000 – $42,000 | 4 – 5 weeks |
| Premium or large ensuite (stone, large format, custom joinery) | $35,000 – $55,000+ | 5 – 7 weeks |
| Rental turnaround refresh (regrout, reseal, tapware, vanity) | $3,500 – $8,000 | 3 – 6 days |
Older Brisbane homes with asbestos sheeting, termite damage or failed subfloors carry additional cost. We test and identify these at inspection rather than issuing a variation halfway through.
The same sequence every time, so you always know what happens next and who is on site.
A supervisor attends your Brisbane property, measures, photographs and checks the subfloor, frame and existing waterproofing so nothing surprises either of us later.
You receive a line-by-line scope with inclusions, fixture allowances, exclusions and a start window. Nothing is left as 'to be confirmed'.
We help you choose tiles, tapware, vanity and screen within your allowance, then order everything before demolition so the job does not stall waiting on stock.
Week one: strip-out, repairs, plumbing and electrical rough-in, sheeting and screed. You get photos at the end of each stage.
Membrane applied and cured, tiling completed, then cabinetry, glass, tapware and fixtures installed and tested.
Final paint touch-up, detail clean, waterproofing certificate, compliance paperwork and a photo report. Then your bathroom is yours again.
Send your Brisbane address and a few photos. We will arrange the measure and have a fixed written quote back to you within 48 hours.
We renovate bathrooms right across the Brisbane City Council area and the surrounding corridors, including these suburbs and everything in between.
The questions Brisbane homeowners, landlords and property managers ask us most.
Planning the kitchen too? See our Brisbane kitchen renovation page for costs, timelines and inclusions. Brisbane kitchen renovations

Patch and paint, flooring, re-sheeting walls, demolition and strip-outs through to kitchen and bathroom refreshes, scheduled around tenancies and settlements.

Selling soon? We walk the property, show you which small investments are likely to lift buyer appeal the most, then deliver the works before photos and open homes.

End of lease, pre-sale, builders and deep cleans completed to the checklists agents use at final inspection, so bonds and handovers go smoothly.