Brisbane wide, inspections within 3 days

Brisbane bathroom renovations, start to finish.

Restart Property Group renovates bathrooms across Brisbane for homeowners, landlords, property managers and body corporates. One contract covers demolition, waterproofing, plumbing, electrical, tiling, fit-off and the final clean, with a fixed written price before work begins.

  • Licensed QLD trades
  • Fixed written quote
  • Quote in 48 hours
Renovated Brisbane bathroom with floor to ceiling tiling and a frameless shower screen
In short

Quick answer

A bathroom renovation in Brisbane typically takes three to four weeks on site and costs between $18,000 and $30,000 for a standard main bathroom, or $30,000 to $55,000 for a large or structurally altered bathroom. Restart Property Group manages the full job — strip-out, waterproofing to AS 3740, plumbing, electrical, tiling, cabinetry, fit-off and the final clean — under one fixed written quote, with licensed Queensland trades and a QBCC-compliant scope.

Typical cost
$18,000 – $30,000 standard main bathroom
Typical duration
3 – 4 weeks on site
Waterproofing
Certified to AS 3740, documented
Service area
Brisbane North, South, East, West and bayside

Brisbane bathrooms age faster than most. Humidity, Queenslander subfloors, older copper pipework and decades-old waterproofing membranes mean a bathroom that looks merely tired is often leaking quietly into the wall frame. We open up, assess and price honestly, so you know what you are buying before a single tile comes off.

  • Licensed Queensland plumbers, electricians, waterproofers and tilers on every job
  • Fixed written scope and price — no hourly creep once works start
  • Waterproofing certificates and photo records handed over at completion
  • Works sequenced around tenancies, settlements and body corporate approvals
Free, no obligation

Book your free Brisbane measure and quote.

We inspect within three days anywhere in Brisbane and send a fixed written price within 48 hours. No deposit, no pressure, no sales visit that runs for three hours.

  • On-site measure with a supervisor, not a salesperson
  • Line-by-line scope so you can compare quotes fairly
  • Urgent and emergency work attended 24/7 on 1300 661 965

Prefer to talk it through?

1300 661 965

Available 24 hours a day, 7 days a week.

Enquiry form

Get your Brisbane bathroom quote.

Send us the suburb, the size of the bathroom and what you would like changed. A Brisbane coordinator will arrange your on-site measure and send a written fixed price within 48 hours.

Call 1300 661 965

We reply within one business day. Urgent or emergency work is attended 24/7.

What's included

What a Restart bathroom renovation includes

Every scope is written for the property in front of us. These are the elements included in a typical Brisbane job.

Strip-out and make-safe

Full removal of tiles, wall sheeting, vanity, bath, screen and fixtures, with services isolated by licensed trades. All waste removed from site and disposed of responsibly — no skip left on your Brisbane kerb for a fortnight.

Structural and frame repairs

Rotten studs, soft subfloor, termite damage and failed sheeting repaired before anything is covered up. Common in pre-1980 Brisbane homes and Queenslanders, and the single biggest cause of a renovation going over budget when it is not checked first.

Plumbing and electrical rough-in

Relocation of waste and water points, new mixers, shower rails, bath spouts, heated towel rails, exhaust fans, downlights, three-in-one units and GPOs — all installed and certified by licensed Queensland tradespeople.

Waterproofing to AS 3740

Membrane applied to the shower, floor and wet wall junctions by a licensed waterproofer, with the required curing time respected and a certificate issued. This is the step cheap quotes shortcut, and the one that causes leaks three years later.

Tiling, screeding and falls

Floor screeded to correct falls so water goes to the waste and not your hallway. Wall and floor tiling including large format, subway, fishscale and feature niches, with silicone and grout finished neatly.

Cabinetry, stone and fit-off

Wall-hung or floor-standing vanities, stone or laminate tops, shaving cabinets, frameless or semi-frameless screens, toilet suites, tapware, accessories and the final paint, then a full detail clean before handover.

Pricing guide

What a bathroom renovation costs in Brisbane

Prices below are realistic 2025 Brisbane ranges for a full renovation including labour, materials, waterproofing and certification. Your written quote is fixed to the scope agreed after the on-site measure.

ScopeTypical Brisbane costTimeframe
Budget refresh (same layout, standard fittings)$12,000 – $18,0002 – 3 weeks
Standard main bathroom (full strip-out, same layout)$18,000 – $30,0003 – 4 weeks
Layout change (moving waste, bath to walk-in shower)$28,000 – $42,0004 – 5 weeks
Premium or large ensuite (stone, large format, custom joinery)$35,000 – $55,000+5 – 7 weeks
Rental turnaround refresh (regrout, reseal, tapware, vanity)$3,500 – $8,0003 – 6 days

Older Brisbane homes with asbestos sheeting, termite damage or failed subfloors carry additional cost. We test and identify these at inspection rather than issuing a variation halfway through.

Step by step

How your Brisbane bathroom renovation runs

The same sequence every time, so you always know what happens next and who is on site.

  1. On-site measure within 3 days

    A supervisor attends your Brisbane property, measures, photographs and checks the subfloor, frame and existing waterproofing so nothing surprises either of us later.

  2. Fixed written quote within 48 hours

    You receive a line-by-line scope with inclusions, fixture allowances, exclusions and a start window. Nothing is left as 'to be confirmed'.

  3. Selections and ordering

    We help you choose tiles, tapware, vanity and screen within your allowance, then order everything before demolition so the job does not stall waiting on stock.

  4. Demolition and rough-in

    Week one: strip-out, repairs, plumbing and electrical rough-in, sheeting and screed. You get photos at the end of each stage.

  5. Waterproof, tile and fit-off

    Membrane applied and cured, tiling completed, then cabinetry, glass, tapware and fixtures installed and tested.

  6. Clean, certify and hand back

    Final paint touch-up, detail clean, waterproofing certificate, compliance paperwork and a photo report. Then your bathroom is yours again.

Why Restart

Why Brisbane owners and managers choose Restart

  • Fixed price written in plain English, not a one-line estimate on a text message
  • Licensed and insured Queensland trades, with QBCC-compliant documentation
  • Single coordinator from quote through to handover — one number to call
  • Experience with Queenslanders, post-war homes, units and body corporate approvals
  • Photo updates at every stage so interstate investors can follow progress
  • Able to combine the bathroom with painting, flooring, bond cleaning or a full pre-sale refresh

Ready to get a price?

Send your Brisbane address and a few photos. We will arrange the measure and have a fixed written quote back to you within 48 hours.

  • Inspection booked within three days
  • Compliance certificates and photo report at handover
  • Combine with other works in a single quote
Get a bathroom quote
Where we work

Bathroom renovations across Brisbane

We renovate bathrooms right across the Brisbane City Council area and the surrounding corridors, including these suburbs and everything in between.

  • Brisbane CBDQLD
  • New FarmQLD
  • PaddingtonQLD
  • AshgroveQLD
  • ChermsideQLD
  • AspleyQLD
  • CarindaleQLD
  • CoorparooQLD
  • Holland ParkQLD
  • Mount GravattQLD
  • SunnybankQLD
  • IndooroopillyQLD
  • KenmoreQLD
  • The GapQLD
  • WynnumQLD
  • ManlyQLD
  • RedcliffeQLD
  • LoganQLD
  • IpswichQLD
  • North LakesQLD
FAQ

Brisbane bathroom renovation questions, answered.

The questions Brisbane homeowners, landlords and property managers ask us most.

Still not sure?

1300 661 965

Talk to a coordinator any hour of the day.

How much does a bathroom renovation cost in Brisbane?
A standard main bathroom renovation in Brisbane costs between $18,000 and $30,000 in 2025, covering full strip-out, waterproofing, plumbing, electrical, tiling, a new vanity, toilet, shower screen and tapware. A cosmetic refresh that keeps the existing layout and tiles can start around $12,000, while a large ensuite with stone benchtops, custom joinery and a changed layout generally runs $35,000 to $55,000.
How long does a bathroom renovation take in Brisbane?
Three to four weeks on site is typical for a standard bathroom. The sequence is roughly one week for demolition, repairs and rough-in, several days for waterproofing and curing, one week for tiling, then a week for cabinetry, glass and fit-off. Layout changes, custom joinery or stone tops add one to three weeks, mostly in lead times rather than labour.
Do I need council approval to renovate a bathroom in Brisbane?
Most like-for-like bathroom renovations in Brisbane do not require development approval from Brisbane City Council, because you are not altering the building's structure or footprint. Approval or certification may be needed if you move a load-bearing wall, alter the roofline, change the building's classification, or renovate a property with a heritage or character overlay. Licensed plumbing and electrical work always requires the relevant compliance certificates, which we supply as part of the job.
Is waterproofing a bathroom a legal requirement in Queensland?
Yes. Bathroom waterproofing in Queensland must comply with the National Construction Code and Australian Standard AS 3740, and the work must be carried out by a licensed waterproofer. You should receive a waterproofing certificate at completion. Restart provides that certificate along with photos of the membrane before tiling, which is important evidence if you later sell or make an insurance claim.
Can you renovate a bathroom in a Brisbane unit or apartment?
Yes. Unit and apartment bathrooms require extra planning around body corporate approvals, building access hours, lift protection, noise restrictions and waste removal. We prepare the scope and insurance documentation body corporates ask for and schedule noisy works within permitted hours so your neighbours stay onside.
What if there is asbestos in my old Brisbane bathroom?
Homes built or renovated before the late 1980s often have asbestos cement sheeting behind tiles or in the ceiling. We sample and test suspected material before demolition. If asbestos is confirmed, removal is carried out by licensed removalists under Queensland work health and safety requirements, with a clearance certificate issued before the new work proceeds.
Can I use the bathroom while the renovation is happening?
No — the bathroom being renovated is out of action for the whole program, because services are disconnected and the waterproofing membrane must cure undisturbed. If it is your only bathroom, we can stage the job to reduce downtime or arrange a temporary toilet on site. Most clients with a second bathroom find the disruption manageable.
Do you renovate bathrooms in rental properties between tenancies?
Yes, and it is a large part of our Brisbane work. We schedule backwards from your re-let date, order materials before vacancy starts and work continuously so the property is back on the market as quickly as possible. For landlords who want to spend less, a regrout, reseal, new tapware and a new vanity often presents almost as well for a fraction of a full renovation.
Does a bathroom renovation add value to a Brisbane home?
A dated bathroom is one of the first things Brisbane buyers discount for. A well-executed renovation typically returns most of its cost in sale price and makes a property far easier to sell or rent, particularly in established suburbs where competing stock has already been updated. We can walk the property before you list and advise whether a full renovation or a cheaper presentation refresh makes more sense for your price bracket.
Do you offer a warranty on bathroom renovations?
Yes. Our workmanship is backed by the statutory warranties that apply to residential building work in Queensland, and product warranties from fixture manufacturers are passed on to you. You also receive the waterproofing certificate, plumbing and electrical compliance paperwork and a complete photo record at handover.
Often combined with

Planning the kitchen too? See our Brisbane kitchen renovation page for costs, timelines and inclusions. Brisbane kitchen renovations

Painter rolling fresh paint onto an interior wall during a renovation

Repairs and Renovations

Patch and paint, flooring, re-sheeting walls, demolition and strip-outs through to kitchen and bathroom refreshes, scheduled around tenancies and settlements.

Freshly presented kitchen ready for sale photography

Pre-Sale Value Uplift

Selling soon? We walk the property, show you which small investments are likely to lift buyer appeal the most, then deliver the works before photos and open homes.

Bond cleaner scrubbing an oven during an end of lease clean

Cleaning and Bond Cleaning

End of lease, pre-sale, builders and deep cleans completed to the checklists agents use at final inspection, so bonds and handovers go smoothly.